Assembly and Execution
ASSEMBLING AND COUPLING SYSTEM (fig. 1)
- a – Tube;
- b – Nut;
- c – Tapered ring;
- d – Washer;
- e – Fluorinated elastomer gasket;
- f – Fitting body.
EXECUTION
1 – Cut the tube cleanly and accurately;
2 – Place the different parts over the tube in the following sequence:
– nut
– tapered ring
– washer
– gasket (it sholud slide over the tube with light friction)
3 – Introduce the tube into the fitting up to abutting end;
4 – Screw and tighten the nut by hands;
5 – Tighten the nut by spanner (possibly torque spanner).